ITAC Assessment: LL0121
ITAC logo
ITAC Assessment: LL0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Paper bags and paper shingle wrap
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 210,000
ft2
Annual Production 31,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,714 2,384,000
kWh
Electricity Demand $16,523 4,785
kW-mo/yr
Electricity Fees $(-5,738.0) -
Natural Gas $89,214 14,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,365 $2,160 $10,928
146,152
kWh
- $437 -
02 2.3212: Optimize plant power factor $4,301 $15,406 - $4,136
-
kW-mo/yr
$165 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $593 $495 $539
7,207
kWh
$31
-
kW-mo/yr
$23 -
04 2.8123: Pay utility bills on time $3,665 - - - $3,665 -
05 2.8123: Pay utility bills on time $10,648 - - - - $10,648
-
MMBtu
TOTAL RECOMMENDED $30,572 $18,061 $11,467
153,359
kWh
$4,167
-
kW-mo/yr
$4,290 $10,648
-
MMBtu
TOTAL IMPLEMENTED $26,271 $2,655 $11,467
153,359
kWh
$31
-
kW-mo/yr
$4,125 $10,648
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs