ITAC Assessment: OR0045
ITAC logo
ITAC Assessment: OR0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FABRICATED LAMB
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area
n/a
Annual Production 12,200,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,992 1,653,576
kWh
LPG $41,930 11,799
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $1,601 $320 - $1,601
-
MMBtu
-
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $614 $513 - $614
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $61 $64 $61
1,758
kWh
- -
04 2.2444: Use hot process fluids to preheat incoming process fluids $3,612 $5,792 - $3,612
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,758 $8,921 $2,691
74,736
kWh
- $3,067
06 2.2414: Use waste heat from hot flue gases to preheat $1,542 $3,258 - $1,542
-
MMBtu
-
TOTAL RECOMMENDED $13,188 $18,868 $2,752
76,494
kWh
$7,369
-
MMBtu
$3,067
TOTAL IMPLEMENTED $5,758 $8,921 $2,691
74,736
kWh
- $3,067
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs