ITAC Assessment: WM0207
ITAC logo
ITAC Assessment: WM0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Contracted Metal Fabrication
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 83,875
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $456,802 7,580,375
kWh
Electricity Demand $258,292 16,732
kW-mo/yr
Electricity Fees $131,938 -
Natural Gas $343,011 43,442
MMBtu
Waste Disposal Costs
Water Usage $24,832 3,899
Tgal
TOTAL YEARLY COSTS $1,214,875
RECOMMENDED SAVINGS* $43,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,028 $12,825 $14,966
249,438
kWh
$4,061
-
kW-mo/yr
-
02 3.4116: Meter recycled water (to reduce sewer charges) $16,759 $2,500 - - $16,759
-
Tgal
03 2.4221: Install compressor air intakes in coolest locations $3,619 $4,084 $2,676
44,598
kWh
$943
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $3,129 $540 $1,429
23,823
kWh
$1,700
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,225 $1,100 $906
15,096
kWh
$320
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,760 $21,049 $19,977
332,955
kWh
$7,024
-
kW-mo/yr
$16,759
-
Tgal
TOTAL IMPLEMENTED $23,872 $18,009 $18,548
309,132
kWh
$5,324
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs