Assessment Year | 2023 |
---|---|
Principal Product | Contracted Metal Fabrication |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
83,875
ft2
|
Annual Production | 120,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $456,802 | 7,580,375 |
kWh
|
$0.060 | |
Electricity Demand | $258,292 | 16,732 |
kW-mo/yr
|
$15.44 | |
Electricity Fees | $131,938 | - |
|
- | |
Natural Gas | $343,011 | 43,442 |
MMBtu
|
$7.90 | |
Waste Disposal Costs | |||||
Water Usage | $24,832 | 3,899 |
Tgal
|
$6.37 | |
TOTAL YEARLY COSTS | $1,214,875 | ||||
RECOMMENDED SAVINGS* | $43,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $23,872 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,028 | $12,825 |
$14,966
249,438
kWh
|
$4,061
-
kW-mo/yr
|
- | |
02 | 3.4116: Meter recycled water (to reduce sewer charges) | $16,759 | $2,500 | - | - |
$16,759
-
Tgal
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $3,619 | $4,084 |
$2,676
44,598
kWh
|
$943
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $3,129 | $540 |
$1,429
23,823
kWh
|
$1,700
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,225 | $1,100 |
$906
15,096
kWh
|
$320
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $43,760 | $21,049 |
$19,977
332,955
kWh
|
$7,024
-
kW-mo/yr
|
$16,759
-
Tgal
|
||
TOTAL IMPLEMENTED | $23,872 | $18,009 |
$18,548
309,132
kWh
|
$5,324
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs