ITAC Assessment: WM0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial Equipment
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 200,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 2,475
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,952 1,898,526
kWh
Electricity Demand $76,989 6,627
kW-mo/yr
Electricity Fees $21,234 -
Natural Gas $36,002 5,594
MMBtu
Waste Disposal Costs
Water Usage $50,339 3,473
Tgal
TOTAL YEARLY COSTS $335,516
RECOMMENDED SAVINGS* $18,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $7,891 - $7,891
99,254
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $4,429 - $2,374
29,864
kWh
$1,424
-
kW-mo/yr
$631
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,139 $3,096 $1,337
16,821
kWh
$802
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $1,894 $7,480 $1,894
23,822
kWh
- -
05 2.7135: Install occupancy sensors $892 $1,307 $577
7,259
kWh
$315
-
kW-mo/yr
-
06 2.7444: Close holes and openings in building such as broken windows $781 $1,300 - - $781
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $582 $1,595 $529
6,654
kWh
$53
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,608 $14,778 $14,603
183,674
kWh
$2,594
-
kW-mo/yr
$1,411
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs