Assessment Year | 2006 |
---|---|
Principal Product | electronic assembly equipment |
NAICS | 333242: Semiconductor Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 81 |
Plant Area |
205,000
ft2
|
Annual Production | 8,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $450,927 | 5,074,036 |
kWh
|
$0.089 |
Electricity Demand | $36,748 | 12,177 |
kW-mo/yr
|
$3.02 |
Electricity Fees | $2,549 | - |
|
- |
Natural Gas | $74,521 | 6,339 |
MMBtu
|
$11.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,714 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,549 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $20,203 | - | - | - | $20,203 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,395 | - |
$6,003
67,454
kWh
|
$392
-
kW-mo/yr
|
- | - | |
03 | 2.4314: Use synthetic lubricant | $2,163 | - |
$1,991
22,370
kWh
|
$172
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,001 | - |
$1,841
20,684
kWh
|
$160
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,928 | $542 |
$4,626
51,976
kWh
|
$302
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,182 | $1,050 |
$7,805
87,696
kWh
|
$377
-
kW-mo/yr
|
- | - | |
07 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $14,472 | $9,451 | - | - | - |
$14,472
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,003 | $7,100 |
$5,312
59,686
kWh
|
$691
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $47,954 | $81,620 |
$45,017
505,814
kWh
|
$2,937
-
kW-mo/yr
|
- | - | |
10 | 2.6211: Conserve energy by efficient use of vending machines | $392 | $687 |
$374
4,205
kWh
|
$18
-
kW-mo/yr
|
- | - | |
11 | 2.2414: Use waste heat from hot flue gases to preheat | $2,021 | $11,554 | - | - | - |
$2,021
-
MMBtu
|
|
TOTAL RECOMMENDED | $114,714 | $112,004 |
$72,969
819,885
kWh
|
$5,049
-
kW-mo/yr
|
$20,203 |
$16,493
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,549 | $1,050 |
$11,637
130,750
kWh
|
$709
-
kW-mo/yr
|
$20,203 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs