ITAC Assessment: WM0184
ITAC logo
ITAC Assessment: WM0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bags: plastics, laminated and coated
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,306 1,513,096
kWh
Electricity Demand $59,675 3,942
kW-mo/yr
Electricity Fees $15,369 -
Natural Gas $83,238 11,963
MMBtu
TOTAL YEARLY COSTS $250,588
RECOMMENDED SAVINGS* $10,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $4,492 $6,200 $(-573.4)
9,400
kWh
- $5,065
-
MMBtu
02 2.7135: Install occupancy sensors $2,076 $1,190 $1,502
24,624
kWh
$574
-
kW-mo/yr
-
03 2.7231: Use radiant heater for spot heating $1,517 $3,265 - - $1,517
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $844 $850 $564
9,244
kWh
$280
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $779 $1,030 $520
8,527
kWh
$259
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $592 - $395
6,475
kWh
$197
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $87 $54 $58
948
kWh
$29
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,386 $12,589 $2,466
59,218
kWh
$1,338
-
kW-mo/yr
$6,582
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs