Assessment Year | 2022 |
---|---|
Principal Product | Bags: plastics, laminated and coated |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 2673: Plastics, Foil, and Coated Paper Bags |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
50,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,306 | 1,513,096 |
kWh
|
$0.061 |
Electricity Demand | $59,675 | 3,942 |
kW-mo/yr
|
$15.14 |
Electricity Fees | $15,369 | - |
|
- |
Natural Gas | $83,238 | 11,963 |
MMBtu
|
$6.96 |
TOTAL YEARLY COSTS | $250,588 | |||
RECOMMENDED SAVINGS* | $10,386 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $4,492 | $6,200 |
$(-573.4)
9,400
kWh
|
- |
$5,065
-
MMBtu
|
|
02 | 2.7135: Install occupancy sensors | $2,076 | $1,190 |
$1,502
24,624
kWh
|
$574
-
kW-mo/yr
|
- | |
03 | 2.7231: Use radiant heater for spot heating | $1,517 | $3,265 | - | - |
$1,517
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $844 | $850 |
$564
9,244
kWh
|
$280
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $779 | $1,030 |
$520
8,527
kWh
|
$259
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $592 | - |
$395
6,475
kWh
|
$197
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $87 | $54 |
$58
948
kWh
|
$29
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $10,386 | $12,589 |
$2,466
59,218
kWh
|
$1,338
-
kW-mo/yr
|
$6,582
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs