Assessment Year | 2022 |
---|---|
Principal Product | Industrial Vacuum Trucks |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 102 |
Plant Area |
183,000
ft2
|
Annual Production | 175
units
|
Production Hrs. Annual | 2,750
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $68,414 | 1,149,861 |
kWh
|
$0.059 | |
Electricity Demand | $71,277 | 5,129 |
kW-mo/yr
|
$13.90 | |
Electricity Fees | $16,665 | - |
|
- | |
Natural Gas | $51,332 | 6,858 |
MMBtu
|
$7.48 | |
Waste Disposal Costs | |||||
Water Usage | $5,001 | 409 |
Tgal
|
$12.23 | |
TOTAL YEARLY COSTS | $212,689 | ||||
RECOMMENDED SAVINGS* | $10,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,136 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,014 | - |
$1,864
31,332
kWh
|
$1,150
-
kW-mo/yr
|
- | |
02 | 2.7444: Close holes and openings in building such as broken windows | $2,032 | $2,040 | - | - |
$2,032
-
MMBtu
|
|
03 | 2.7231: Use radiant heater for spot heating | $1,573 | $4,352 | - | - |
$1,573
-
MMBtu
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $1,560 | - |
$1,050
17,649
kWh
|
$510
-
kW-mo/yr
|
- | |
05 | 2.7444: Close holes and openings in building such as broken windows | $1,483 | $1,650 | - | - |
$1,483
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,090 | $2,850 |
$675
11,340
kWh
|
$416
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $10,752 | $10,892 |
$3,589
60,321
kWh
|
$2,075
-
kW-mo/yr
|
$5,088
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,136 | $4,890 |
$2,539
42,672
kWh
|
$1,565
-
kW-mo/yr
|
$2,032
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs