Assessment Year | 2022 |
---|---|
Principal Product | paper towels, toilet tissue, and facial tissue |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 640 |
Plant Area |
1,600,000
ft2
|
Annual Production | 225,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $18,547,066 | 407,621,652 |
kWh
|
$0.046 | |
Electricity Demand | $4,944,852 | 641,610 |
kW-mo/yr
|
$7.71 | |
Natural Gas | $16,183,650 | 3,678,303 |
MMBtu
|
$4.40 | |
Waste Disposal Costs | |||||
Water Usage | $1,898,506 | 225,200 |
Tgal
|
$8.43 | |
TOTAL YEARLY COSTS | $41,574,074 | ||||
RECOMMENDED SAVINGS* | $2,450,338 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $941,741 | $1,060,000 | - | - |
$941,741
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $840,840 | $38,534 | - | - |
$840,840
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $447,150 | $2,178,400 |
$363,466
7,901,432
kWh
|
$83,684
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $116,088 | $85,000 |
$99,982
2,172,352
kWh
|
$16,106
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $98,046 | $48,230 |
$79,696
1,732,526
kWh
|
$18,350
-
kW-mo/yr
|
- | |
06 | 2.7224: Reduce space conditioning during non-working hours | $6,473 | - |
$6,473
140,710
kWh
|
- | - | |
TOTAL RECOMMENDED | $2,450,338 | $3,410,164 |
$549,617
11,947,020
kWh
|
$118,140
-
kW-mo/yr
|
$1,782,581
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs