ITAC Assessment: WM0175
ITAC logo
ITAC Assessment: WM0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product paper towels, toilet tissue, and facial tissue
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 640
Plant Area 1,600,000
ft2
Annual Production 225,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,547,066 407,621,652
kWh
Electricity Demand $4,944,852 641,610
kW-mo/yr
Natural Gas $16,183,650 3,678,303
MMBtu
Waste Disposal Costs
Water Usage $1,898,506 225,200
Tgal
TOTAL YEARLY COSTS $41,574,074
RECOMMENDED SAVINGS* $2,450,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1213: Direct warmest air to combustion intake $941,741 $1,060,000 - - $941,741
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $840,840 $38,534 - - $840,840
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $447,150 $2,178,400 $363,466
7,901,432
kWh
$83,684
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $116,088 $85,000 $99,982
2,172,352
kWh
$16,106
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $98,046 $48,230 $79,696
1,732,526
kWh
$18,350
-
kW-mo/yr
-
06 2.7224: Reduce space conditioning during non-working hours $6,473 - $6,473
140,710
kWh
- -
TOTAL RECOMMENDED $2,450,338 $3,410,164 $549,617
11,947,020
kWh
$118,140
-
kW-mo/yr
$1,782,581
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs