ITAC Assessment: NC0507
ITAC logo
ITAC Assessment: NC0507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Smoked meats
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 115,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,805 5,221,000
kWh
Electricity Demand $139,762 12,262
kW-mo/yr
Electricity Fees $20,692 -
LPG $119,253 8,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.2628: Utilize a less expensive cooling method $13,167 $23,000 $10,481
191,603
kWh
- $2,686
-
MMBtu
02 2.2437: Recover waste heat from equipment $16,846 $43,969 $430
7,867
kWh
- $16,416
-
MMBtu
03 2.1332: Convert combustion equipment to burn natural gas $51,724 $62,000 - $(-67,529.0)
-
MMBtu
$119,253
-
MMBtu
04 2.1232: Keep boiler tubes clean $6,811 $2,000 - - $6,811
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $806 $650 $806
14,732
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $264 $50 $264
4,848
kWh
- -
07 2.7135: Install occupancy sensors $1,828 $1,018 $1,828
33,422
kWh
- -
08 2.7134: Use photocell controls $72 $80 $72
1,320
kWh
- -
09 2.4151: Develop a repair/replace policy $2,801 $10,912 $2,801
51,185
kWh
- -
TOTAL RECOMMENDED $94,319 $143,679 $16,682
304,977
kWh
$(-67,529.0)
-
MMBtu
$145,166
-
MMBtu
TOTAL IMPLEMENTED $9,876 $12,962 $3,065
56,033
kWh
- $6,811
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings