ITAC Assessment: WM0166
ITAC logo
ITAC Assessment: WM0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product concrete plants
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 90,000
ft2
Annual Production 32
pieces
Production Hrs. Annual 4,048
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,670 1,357,001
kWh
Electricity Demand $67,844 4,543
kW-mo/yr
Electricity Fees $20,766 -
Natural Gas $27,241 4,827
MMBtu
Waste Disposal Costs
Water Usage $3,863 266
Tgal
TOTAL YEARLY COSTS $200,384
RECOMMENDED SAVINGS* $26,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $12,220 $10,675 - - $12,220
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $9,928 $36,500 $6,368
107,116
kWh
$3,560
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,884 $3,500 $1,209
20,331
kWh
$675
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,198 $2,170 $768
12,921
kWh
$430
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,099 $1,200 $705
11,860
kWh
$394
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $328 $1,500 $328
5,521
kWh
- -
TOTAL RECOMMENDED $26,657 $55,545 $9,378
157,749
kWh
$5,059
-
kW-mo/yr
$12,220
-
MMBtu
TOTAL IMPLEMENTED $1,198 $2,170 $768
12,921
kWh
$430
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs