ITAC Assessment: WM0162
ITAC logo
ITAC Assessment: WM0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Molded Silicone Medical Devices
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $50
M
to 100
M
# of Employees 390
Plant Area 40,000
ft2
Annual Production 400,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $588,662 12,240,082
kWh
Electricity Demand $328,526 23,980
kW-mo/yr
Electricity Fees $67,488 -
Natural Gas $27,450 5,770
MMBtu
Waste Disposal Costs
Water Usage $16,169 1,995
Tgal
TOTAL YEARLY COSTS $1,028,295
RECOMMENDED SAVINGS* $32,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1224: Replace boiler $14,495 $38,512 - - $14,495
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,315 $3,500 $4,137
86,186
kWh
$1,178
-
kW-mo/yr
-
03 2.7241: Install outside air damper / economizer on hvac unit $4,757 $2,560 $4,757
99,099
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,639 $8,039 $2,584
53,828
kWh
$1,055
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,584 $2,625 $1,584
32,995
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $1,380 $2,300 $983
20,480
kWh
$397
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $1,298 $4,575 $1,298
27,030
kWh
- -
TOTAL RECOMMENDED $32,468 $62,111 $15,343
319,618
kWh
$2,631
-
kW-mo/yr
$14,495
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs