| Assessment Year | 2020 |
|---|---|
| Principal Product | Water treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 24 |
| Plant Area |
500,000
ft2
|
| Annual Production | 3,650,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $548,627 | 9,078,390 |
kWh
|
$0.060 | |
| Electricity Demand | $211,685 | 15,658 |
kW-mo/yr
|
$13.52 | |
| Electricity Fees | $28,801 | - |
|
- | |
| Natural Gas | $131,659 | 27,419 |
MMBtu
|
$4.80 | |
| Waste Disposal Costs | |||||
| Water Usage | $29,783 | 17,842 |
Tgal
|
$1.67 | |
| TOTAL YEARLY COSTS | $950,555 | ||||
| RECOMMENDED SAVINGS* | $52,500 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $1,132 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $17,247 | $206,684 |
$17,247
284,880
kWh
|
- | - | |
| 02 | 2.6127: Maintain air filters by cleaning or replacement | $12,529 | $45,928 |
$9,596
158,490
kWh
|
$2,933
-
kW-mo/yr
|
- | |
| 03 | 2.4321: Upgrade obsolete equipment | $7,721 | $41,700 |
$6,359
105,038
kWh
|
$1,362
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,446 | $33,852 |
$5,702
94,188
kWh
|
$1,744
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $3,864 | $2,250 |
$3,350
55,335
kWh
|
$514
-
kW-mo/yr
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $1,778 | $965 | - | - |
$1,778
-
MMBtu
|
|
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,132 | - |
$867
14,320
kWh
|
$265
-
kW-mo/yr
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $783 | $1,513 |
$600
9,907
kWh
|
$183
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $52,500 | $332,892 |
$43,721
722,158
kWh
|
$7,001
-
kW-mo/yr
|
$1,778
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,132 | - |
$867
14,320
kWh
|
$265
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs