ITAC Assessment: WM0158
ITAC logo
ITAC Assessment: WM0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Water treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 24
Plant Area 500,000
ft2
Annual Production 3,650,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $548,627 9,078,390
kWh
Electricity Demand $211,685 15,658
kW-mo/yr
Electricity Fees $28,801 -
Natural Gas $131,659 27,419
MMBtu
Waste Disposal Costs
Water Usage $29,783 17,842
Tgal
TOTAL YEARLY COSTS $950,555
RECOMMENDED SAVINGS* $52,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $17,247 $206,684 $17,247
284,880
kWh
- -
02 2.6127: Maintain air filters by cleaning or replacement $12,529 $45,928 $9,596
158,490
kWh
$2,933
-
kW-mo/yr
-
03 2.4321: Upgrade obsolete equipment $7,721 $41,700 $6,359
105,038
kWh
$1,362
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,446 $33,852 $5,702
94,188
kWh
$1,744
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $3,864 $2,250 $3,350
55,335
kWh
$514
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $1,778 $965 - - $1,778
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,132 - $867
14,320
kWh
$265
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $783 $1,513 $600
9,907
kWh
$183
-
kW-mo/yr
-
TOTAL RECOMMENDED $52,500 $332,892 $43,721
722,158
kWh
$7,001
-
kW-mo/yr
$1,778
-
MMBtu
TOTAL IMPLEMENTED $1,132 - $867
14,320
kWh
$265
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs