ITAC Assessment: WM0153
ITAC logo
ITAC Assessment: WM0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Waster Water treatment plant
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 4
Plant Area 240,780
ft2
Annual Production 1,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,257 794,040
kWh
Electricity Demand $17,752 1,972
kW-mo/yr
Electricity Fees $2,823 -
Natural Gas $1,824 221
MMBtu
Waste Disposal Costs
Water Usage $5,700 205
Tgal
TOTAL YEARLY COSTS $65,356
RECOMMENDED SAVINGS* $19,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $7,809 $75,000 $6,557
139,754
kWh
- $1,252
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $4,227 $20,000 - - $4,227
-
MMBtu
03 2.4314: Use synthetic lubricant $3,015 $6,600 $3,015
64,293
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,170 $5,633 $1,720
36,662
kWh
$450
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,114 $232 - - $1,114
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $475 $2,110 $376
8,016
kWh
$99
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $376 $25 $298
6,340
kWh
$78
-
kW-mo/yr
-
TOTAL RECOMMENDED $19,186 $109,600 $11,966
255,065
kWh
$627
-
kW-mo/yr
$6,593
-
MMBtu
TOTAL IMPLEMENTED $376 $25 $298
6,340
kWh
$78
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs