Assessment Year | 2024 |
---|---|
Principal Product | Fabricated rubber Products, Not Elsewhere Classified |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
775,000
ft2
|
Annual Production | 240,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $485,719 | 6,730,720 |
kWh
|
$0.072 |
Electricity Demand | $152,235 | 21,717 |
kW-mo/yr
|
$7.01 |
Natural Gas | $553,772 | 124,152 |
MMBtu
|
$4.46 |
TOTAL YEARLY COSTS | $1,191,726 | |||
RECOMMENDED SAVINGS* | $32,366 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,895 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,741 | $5,000 |
$5,741
79,511
kWh
|
- | - | - | - | |
02 | 2.2136: Install / repair insulation on steam lines | $3,199 | $864 | - | - |
$3,199
-
MMBtu
|
- | - | |
03 | 2.2122: Install / repair insulation on condensate lines | $63 | $216 | - | - |
$63
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,454 | $952 |
$2,149
29,765
kWh
|
$305
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,892 | $12,650 |
$4,646
64,350
kWh
|
$902
-
kW-mo/yr
|
- | $(-656.0) | - | |
06 | 2.7135: Install occupancy sensors | $1,343 | $1,667 |
$1,219
16,884
kWh
|
- | - | $3 | $121 | |
07 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $14,674 | $67,830 |
$25,121
347,933
kWh
|
$3,341
-
kW-mo/yr
|
$(-13,788.0)
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $32,366 | $89,179 |
$38,876
538,443
kWh
|
$4,548
-
kW-mo/yr
|
$(-10,526.0)
-
MMBtu
|
$(-653.0) | $121 | ||
TOTAL IMPLEMENTED | $13,895 | $18,730 |
$10,387
143,861
kWh
|
$902
-
kW-mo/yr
|
$3,262
-
MMBtu
|
$(-656.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs