ITAC Assessment: MI0042
ITAC logo
ITAC Assessment: MI0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Offset Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 50,000
ft2
Annual Production 89,440,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,061 3,878,650
kWh
Electricity Demand $118,454 15,186
kW-mo/yr
Natural Gas $48,263 8,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4321: Upgrade obsolete equipment $9,734 $13,500 $9,734
162,240
kWh
- - -
02 3.5316: Contract a wood pallet recycling company $6,826 $36 - - - $6,826
-
lb
03 3.4155: Meter waste water $1,752 $3,650 - - $1,752
-
Tgal
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,665 $2 $3,665
61,097
kWh
- - -
05 2.4133: Use most efficient type of electric motors $1,684 $6,686 $1,225
11,393
kWh
$459
-
kW-mo/yr
- -
TOTAL RECOMMENDED $23,661 $23,874 $14,624
234,730
kWh
$459
-
kW-mo/yr
$1,752
-
Tgal
$6,826
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs