ITAC Assessment: WM0150
ITAC logo
ITAC Assessment: WM0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product OEM plastics Converting
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 93,500
ft2
Annual Production 10,000
units
Production Hrs. Annual 8,568
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,975 1,474,800
kWh
Electricity Demand $55,261 4,352
kW-mo/yr
Electricity Fees $7,631 -
Natural Gas $18,130 2,965
MMBtu
Waste Disposal Costs
Water Usage $21,650 7,233
Tgal
TOTAL YEARLY COSTS $206,647
RECOMMENDED SAVINGS* $20,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,749 $27,082 $7,915
111,479
kWh
$1,834
-
kW-mo/yr
-
02 2.7132: Install timers on light switches in little used areas $3,677 $3,000 $3,400
47,881
kWh
$278
-
kW-mo/yr
-
03 2.6212: Turn off equipment during breaks, reduce operating time $3,191 $3,200 $3,191
44,942
kWh
- -
04 2.7444: Close holes and openings in building such as broken windows $1,791 $700 - - $1,791
-
MMBtu
05 2.7444: Close holes and openings in building such as broken windows $1,170 $570 - - $1,170
-
MMBtu
06 2.2437: Recover waste heat from equipment $980 $1,950 - - $980
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $400 $675 $400
5,616
kWh
- -
TOTAL RECOMMENDED $20,958 $37,177 $14,906
209,918
kWh
$2,112
-
kW-mo/yr
$3,941
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs