| Assessment Year | 2007 |
|---|---|
| Principal Product | trusses |
| NAICS | 321214: Truss Manufacturing |
| SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 100 |
| Plant Area |
115,000
ft2
|
| Annual Production | 70,000,000
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,592 | 2,156,266 |
kWh
|
$0.056 |
| Electricity Demand | $51,071 | 9,897 |
kW-mo/yr
|
$5.16 |
| Electricity Fees | $9,508 | - |
|
- |
| Natural Gas | $26,144 | 2,101 |
MMBtu
|
$12.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,400 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6226: Optimize filtration cleaning / replacement to minimize air resistance | $5,800 | - |
$5,800
56
kWh
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $18,100 | $37,100 |
$18,100
208,000
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,600 | $15,300 |
$5,600
95
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $5,300 | $7,800 |
$5,300
68
kWh
|
- | |
| 05 | 2.4323: Use optimum size and capacity equipment | $3,400 | $9,800 |
$3,400
45
kWh
|
- | |
| 06 | 2.3212: Optimize plant power factor | $2,800 | $13,200 | - | $2,800 | |
| 07 | 2.4133: Use most efficient type of electric motors | $5,300 | $26,900 |
$5,300
55
kWh
|
- | |
| TOTAL RECOMMENDED | $46,300 | $110,100 |
$43,500
208,319
kWh
|
$2,800 | ||
| TOTAL IMPLEMENTED | $32,400 | $70,000 |
$32,400
208,208
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs