ITAC Assessment: OR0516
ITAC logo
ITAC Assessment: OR0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product trusses
NAICS 321214: Truss Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 115,000
ft2
Annual Production 70,000,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,592 2,156,266
kWh
Electricity Demand $51,071 9,897
kW-mo/yr
Electricity Fees $9,508 -
Natural Gas $26,144 2,101
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.6226: Optimize filtration cleaning / replacement to minimize air resistance $5,800 - $5,800
56
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $18,100 $37,100 $18,100
208,000
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,600 $15,300 $5,600
95
kWh
-
04 2.7135: Install occupancy sensors $5,300 $7,800 $5,300
68
kWh
-
05 2.4323: Use optimum size and capacity equipment $3,400 $9,800 $3,400
45
kWh
-
06 2.3212: Optimize plant power factor $2,800 $13,200 - $2,800
07 2.4133: Use most efficient type of electric motors $5,300 $26,900 $5,300
55
kWh
-
TOTAL RECOMMENDED $46,300 $110,100 $43,500
208,319
kWh
$2,800
TOTAL IMPLEMENTED $32,400 $70,000 $32,400
208,208
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs