ITAC Assessment: WM0143
ITAC logo
ITAC Assessment: WM0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Precision Machined Parts
NAICS 332710: Machine Shops
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 131
Plant Area 90,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,187 4,672,365
kWh
Electricity Demand $111,626 8,256
kW-mo/yr
Electricity Fees $11,404 -
Natural Gas $48,157 8,444
MMBtu
TOTAL YEARLY COSTS $456,374
RECOMMENDED SAVINGS* $44,521 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,884

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,945 $12,879 $10,139
166,106
kWh
$1,806
-
kW-mo/yr
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $6,367 $6,400 - - $6,367
-
MMBtu
03 2.6218: Turn off equipment when not in use $5,586 - $5,586
83,333
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,884 $4,500 $3,279
53,712
kWh
$606
-
kW-mo/yr
-
05 2.7272: Install heat pipes / raise cooling setpoint $3,255 - $1,584
25,953
kWh
$1,671
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,250 - $2,374
38,883
kWh
$876
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,164 $1,500 $3,164
51,840
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,815 $2,460 $1,328
21,753
kWh
$487
-
kW-mo/yr
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,598 $2,000 - - $1,598
-
MMBtu
10 2.7447: Install vinyl strip / high speed / air curtain doors $1,438 $928 - - $1,438
-
MMBtu
11 2.7444: Close holes and openings in building such as broken windows $1,240 $748 - - $1,240
-
MMBtu
12 2.7221: Lower temperature during the winter season and vice-versa $979 - - - $979
-
MMBtu
TOTAL RECOMMENDED $44,521 $31,415 $27,454
441,580
kWh
$5,446
-
kW-mo/yr
$11,622
-
MMBtu
TOTAL IMPLEMENTED $3,884 $4,500 $3,279
53,712
kWh
$606
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings