Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Corrugated Cardboard
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2635:
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 180,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,212 2,331,588
kWh
Electricity Demand $17,881 12,317
kW-mo/yr
Natural Gas $325,375 425,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.7495: Install replacement doors $65,227 $72,000 $65,227
2,264,156
kWh
- - - -
02 2.7231: Use radiant heater for spot heating $13,106 $12,800 - - $13,106
-
MMBtu
- -
03 2.1224: Replace boiler $14,342 $2,500 - - $11,842
-
MMBtu
- $2,500
04 2.4239: Eliminate or reduce compressed air usage $8,812 $900 $8,160
234,489
kWh
$652
-
kW-mo/yr
- - -
05 2.1116: Improve combustion control capability $5,194 $2,000 $145
4,160
kWh
- $5,049
-
MMBtu
- -
06 2.4314: Use synthetic lubricant $536 $550 $496
14,244
kWh
$40
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $4,293 $10,160 $3,923
112,752
kWh
$370
-
kW-mo/yr
- - -
08 2.2135: Repair and eliminate steam leaks $2,844 $2,400 $2,844
112,251
kWh
- - - -
09 2.2437: Recover waste heat from equipment $712 $1,000 - - $712
-
MMBtu
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,050 $300 $972
27,930
kWh
$78
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $1,154 $2,480 $860
24,722
kWh
$49
-
kW-mo/yr
- - $245
12 2.7135: Install occupancy sensors $677 $375 $607
17,430
kWh
$70
-
kW-mo/yr
- - -
13 3.4111: Use closed cycle process to minimize waste water production $1,651 $1,250 - - - $1,651
-
Tgal
-
TOTAL RECOMMENDED $119,598 $108,715 $83,234
2,812,134
kWh
$1,259
-
kW-mo/yr
$30,709
-
MMBtu
$1,651
-
Tgal
$2,745
TOTAL IMPLEMENTED $102,975 $91,185 $82,374
2,787,412
kWh
$1,210
-
kW-mo/yr
$16,891
-
MMBtu
- $2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs