ITAC Assessment: GT0305
ITAC logo
ITAC Assessment: GT0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HOME FURNISHINGS
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 490
Plant Area
n/a
Annual Production 37,500
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,484 2,944,021
kWh
Natural Gas $113,343 17,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,342

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.4133: Use most efficient type of electric motors $771 $919 $771
15,533
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,192 $6,512 $5,192
103,751
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,049 $2,100 $1,049
20,809
kWh
- -
04 2.7291: Reschedule and rearrange multiple-source heating systems $9,350 - - $46,685
-
MMBtu
$(-37,335.0)
-
MMBtu
05 2.6122: Adjust vents to minimize energy use $3,652 $1,000 - - $3,652
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,580 - $2,580
51,583
kWh
- -
07 2.7251: Reduce air conditioning load by evaporating water from roof $24,800 $49,200 $24,800
183,177
kWh
- -
08 2.2612: Use cooling tower water instead of refrigeration $4,400 $1,000 $4,400
147,714
kWh
- -
TOTAL RECOMMENDED $51,794 $60,731 $38,792
522,567
kWh
$46,685
-
MMBtu
$(-33,683.0)
-
MMBtu
TOTAL IMPLEMENTED $23,342 $10,531 $13,992
339,390
kWh
$46,685
-
MMBtu
$(-37,335.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs