ITAC Assessment: WM0141
ITAC logo
ITAC Assessment: WM0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Ready Mix Concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $500
k
to 1
M
# of Employees 35
Plant Area 520,000
ft2
Annual Production 240,000
units
Production Hrs. Annual 2,510
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,731 684,098
kWh
Electricity Demand $45,021 3,262
kW-mo/yr
Electricity Fees $2,133 -
Natural Gas $43,235 7,049
MMBtu
Waste Disposal Costs
Water Usage $13,710 2,855
Tgal
TOTAL YEARLY COSTS $160,830
RECOMMENDED SAVINGS* $25,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $8,547 $16,000 - - $8,547
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,388 $4,793 $3,388
49,822
kWh
- - -
03 2.7132: Install timers on light switches in little used areas $3,383 $1,450 $3,383
43,142
kWh
- - -
04 2.4112: Install soft-start to eliminate nuisance trips $3,382 $4,600 $3,382
49,729
kWh
- - -
05 2.8112: Combine utility meters $2,288 $13,750 - - - $2,288
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,028 $3,476 $1,028
7,667
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $961 - $623
9,155
kWh
$338
-
kW-mo/yr
- -
08 2.2511: Insulate bare equipment $806 $2,350 - - $806
-
MMBtu
-
09 2.7444: Close holes and openings in building such as broken windows $758 $1,755 - - $758
-
MMBtu
-
10 2.4314: Use synthetic lubricant $504 $200 $325
4,793
kWh
$179
-
kW-mo/yr
- -
11 2.7444: Close holes and openings in building such as broken windows $400 $670 - - $400
-
MMBtu
-
TOTAL RECOMMENDED $25,445 $49,044 $12,129
164,308
kWh
$518
-
kW-mo/yr
$10,511
-
MMBtu
$2,288
TOTAL IMPLEMENTED $5,611 $6,748 $4,336
63,770
kWh
$518
-
kW-mo/yr
$758
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs