Assessment Year | 2019 |
---|---|
Principal Product | Ready Mix Concrete |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $500 k to 1M |
# of Employees | 35 |
Plant Area |
520,000
ft2
|
Annual Production | 240,000
units
|
Production Hrs. Annual | 2,510
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $56,731 | 684,098 |
kWh
|
$0.083 | |
Electricity Demand | $45,021 | 3,262 |
kW-mo/yr
|
$13.80 | |
Electricity Fees | $2,133 | - |
|
- | |
Natural Gas | $43,235 | 7,049 |
MMBtu
|
$6.13 | |
Waste Disposal Costs | |||||
Water Usage | $13,710 | 2,855 |
Tgal
|
$4.80 | |
TOTAL YEARLY COSTS | $160,830 | ||||
RECOMMENDED SAVINGS* | $25,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $5,611 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $8,547 | $16,000 | - | - |
$8,547
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,388 | $4,793 |
$3,388
49,822
kWh
|
- | - | - | |
03 | 2.7132: Install timers on light switches in little used areas | $3,383 | $1,450 |
$3,383
43,142
kWh
|
- | - | - | |
04 | 2.4112: Install soft-start to eliminate nuisance trips | $3,382 | $4,600 |
$3,382
49,729
kWh
|
- | - | - | |
05 | 2.8112: Combine utility meters | $2,288 | $13,750 | - | - | - | $2,288 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,028 | $3,476 |
$1,028
7,667
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $961 | - |
$623
9,155
kWh
|
$338
-
kW-mo/yr
|
- | - | |
08 | 2.2511: Insulate bare equipment | $806 | $2,350 | - | - |
$806
-
MMBtu
|
- | |
09 | 2.7444: Close holes and openings in building such as broken windows | $758 | $1,755 | - | - |
$758
-
MMBtu
|
- | |
10 | 2.4314: Use synthetic lubricant | $504 | $200 |
$325
4,793
kWh
|
$179
-
kW-mo/yr
|
- | - | |
11 | 2.7444: Close holes and openings in building such as broken windows | $400 | $670 | - | - |
$400
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $25,445 | $49,044 |
$12,129
164,308
kWh
|
$518
-
kW-mo/yr
|
$10,511
-
MMBtu
|
$2,288 | ||
TOTAL IMPLEMENTED | $5,611 | $6,748 |
$4,336
63,770
kWh
|
$518
-
kW-mo/yr
|
$758
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs