ITAC Assessment: LE0166
ITAC logo
ITAC Assessment: LE0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product PVC and CPVC Pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 250,000
ft2
Annual Production 34,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,660 6,239,510
kWh
Electricity Demand $258,301 15,750
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $1,097 $1,000 $495
17,486
kWh
$602
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $578 - $578
20,428
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,005 - $2,098
74,123
kWh
$1,907
-
kW-mo/yr
04 2.4314: Use synthetic lubricant $17,409 $1,000 $2,141
75,643
kWh
$15,268
-
kW-mo/yr
05 2.2515: Use optimum thickness insulation $13,043 $2,731 $7,564
267,298
kWh
$5,479
-
kW-mo/yr
TOTAL RECOMMENDED $36,132 $4,731 $12,876
454,978
kWh
$23,256
-
kW-mo/yr
TOTAL IMPLEMENTED $13,043 $2,731 $7,564
267,298
kWh
$5,479
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs