ITAC Assessment: WM0129
ITAC logo
ITAC Assessment: WM0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 400,000
ft2
Annual Production 3,250,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $864,008 17,481,169
kWh
Electricity Demand $557,508 40,694
kW-mo/yr
Electricity Fees $92,148 -
Natural Gas $52,511 9,268
MMBtu
Waste Disposal Costs
Water Usage $29,259 10,297
Tgal
TOTAL YEARLY COSTS $1,595,434
RECOMMENDED SAVINGS* $107,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $67,159 $96,417 $43,800
886,635
kWh
$23,359
-
kW-mo/yr
- -
02 2.9114: Use solar heat to make electricty $14,063 $48,500 $14,063
272,353
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $11,035 $26,000 $11,035
223,248
kWh
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $9,452 $18,525 - - $9,452
-
MMBtu
-
05 2.7231: Use radiant heater for spot heating $3,585 $2,850 - - $3,585
-
MMBtu
-
06 2.3132: Recharge batteries on during off-peak demand periods $1,558 - - - - $1,558
07 2.7134: Use photocell controls $633 $878 $633
12,807
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $366 $1,616 $187
3,784
kWh
$71
-
kW-mo/yr
- $108
TOTAL RECOMMENDED $107,851 $194,786 $69,718
1,398,827
kWh
$23,430
-
kW-mo/yr
$13,037
-
MMBtu
$1,666
TOTAL IMPLEMENTED $11,376 $20,141 $187
3,784
kWh
$71
-
kW-mo/yr
$9,452
-
MMBtu
$1,666
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs