Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Corrugated Packaging
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 113
Plant Area 117,000
ft2
Annual Production 600,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,845 2,525,400
kWh
Electricity Demand $101,596 7,362
kW-mo/yr
Electricity Fees $19,568 -
Natural Gas $11,271 1,852
MMBtu
Waste Disposal Costs
Water Usage $7,857 651
Tgal
TOTAL YEARLY COSTS $305,137
RECOMMENDED SAVINGS* $57,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,273 $13,601 $14,248
218,292
kWh
$6,025
-
kW-mo/yr
- -
02 2.9114: Use solar heat to make electricty $17,677 $48,514 $17,677
270,829
kWh
- - -
03 2.4314: Use synthetic lubricant $11,015 $21,250 $8,545
130,923
kWh
$2,470
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,087 $2,215 $3,944
60,426
kWh
$1,143
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $2,042 $1,525 $1,435
21,983
kWh
$607
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $791 $1,806 $738
11,300
kWh
- - $53
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $293 - $210
3,152
kWh
$83
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $284 $360 $236
2,520
kWh
$48
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $200 $855 $200
3,068
kWh
- - -
10 2.7135: Install occupancy sensors $86 $136 $67
1,027
kWh
$19
-
kW-mo/yr
- -
11 2.3132: Recharge batteries on during off-peak demand periods $71 - - - $71 -
TOTAL RECOMMENDED $57,819 $90,262 $47,300
723,520
kWh
$10,395
-
kW-mo/yr
$71 $53
TOTAL IMPLEMENTED $5,380 $2,215 $4,154
63,578
kWh
$1,226
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings