ITAC Assessment: WM0118
ITAC logo
ITAC Assessment: WM0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Hydraulic valves
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $100
M
to 500
M
# of Employees 213
Plant Area 70,000
ft2
Annual Production 10,749,234
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,384,683 20,767,190
kWh
Electricity Demand $664,477 49,758
kW-mo/yr
Electricity Fees $55,579 -
Natural Gas $91,867 23,805
MMBtu
TOTAL YEARLY COSTS $2,196,606
RECOMMENDED SAVINGS* $112,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,172

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $39,371 $117,000 $39,371
590,443
kWh
- -
02 2.9114: Use solar heat to make electricty $18,489 $72,000 $18,489
277,273
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,355 $11,813 $10,407
156,073
kWh
$3,948
-
kW-mo/yr
-
04 2.7226: Use computer programs to optimize hvac performance $11,817 - - - $11,817
-
MMBtu
05 2.7231: Use radiant heater for spot heating $8,183 $8,250 - - $8,183
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $6,333 $2,250 $4,970
74,534
kWh
$1,363
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $4,115 $3,020 $2,571
38,554
kWh
$1,544
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,953 $5,010 $3,953
74,854
kWh
- -
09 2.7134: Use photocell controls $2,253 $840 $834
12,511
kWh
$1,419
-
kW-mo/yr
-
10 2.7447: Install vinyl strip / high speed / air curtain doors $1,400 $2,776 - - $1,400
-
MMBtu
11 2.7447: Install vinyl strip / high speed / air curtain doors $1,207 $1,980 - - $1,207
-
MMBtu
12 2.7135: Install occupancy sensors $262 $262 $205
3,079
kWh
$57
-
kW-mo/yr
-
13 2.2511: Insulate bare equipment $255 $510 $117
1,756
kWh
$138
-
kW-mo/yr
-
14 2.7142: Utilize higher efficiency lamps and/or ballasts $197 $527 $154
2,313
kWh
$43
-
kW-mo/yr
-
TOTAL RECOMMENDED $112,190 $226,238 $81,071
1,231,390
kWh
$8,512
-
kW-mo/yr
$22,607
-
MMBtu
TOTAL IMPLEMENTED $26,172 $11,813 $10,407
156,073
kWh
$3,948
-
kW-mo/yr
$11,817
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs