ITAC Assessment: WM0095
ITAC logo
ITAC Assessment: WM0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Cheese, dairy products
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 145,300
ft2
Annual Production 70,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,989,463 32,237,689
kWh
Electricity Demand $722,604 55,702
kW-mo/yr
Electricity Fees $16,773 -
Natural Gas $1,269,679 300,031
MMBtu
TOTAL YEARLY COSTS $3,998,519
RECOMMENDED SAVINGS* $382,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.3112: Store heated/ cooled water for use during peak demand periods $286,874 $438,150 - $199,896
-
kW-mo/yr
$86,978 -
02 3.2176: Increase use of automation $76,440 $5,500 - - - $76,440
03 2.2135: Repair and eliminate steam leaks $7,438 $1,560 $5,771
95,536
kWh
$1,667
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,649 $2,000 $3,611
58,531
kWh
$1,038
-
kW-mo/yr
- -
05 2.3132: Recharge batteries on during off-peak demand periods $2,197 - - - $2,197 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,696 $7,212 $2,696
43,691
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,095 $735 $1,602
25,965
kWh
$493
-
kW-mo/yr
- -
TOTAL RECOMMENDED $382,389 $455,157 $13,680
223,723
kWh
$203,094
-
kW-mo/yr
$89,175 $76,440
TOTAL IMPLEMENTED $14,783 $10,772 $12,078
197,758
kWh
$2,705
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs