ITAC Assessment: WM0094
ITAC logo
ITAC Assessment: WM0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Commercial Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 210,000
ft2
Annual Production 252,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $619,387 12,369,460
kWh
Electricity Demand $290,196 27,414
kW-mo/yr
Electricity Fees $165,593 -
Natural Gas $26,411 7,695
MMBtu
TOTAL YEARLY COSTS $1,101,587
RECOMMENDED SAVINGS* $71,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $31,439 $86,500 $31,439
618,871
kWh
- -
02 2.2437: Recover waste heat from equipment $17,162 $10,800 - - $17,162
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,037 $1,640 $6,251
123,049
kWh
$1,786
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,361 $800 $7,361
144,908
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,446 $11,330 $3,446
67,831
kWh
- -
06 2.7135: Install occupancy sensors $2,084 $480 $2,084
41,021
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,735 $8,250 $1,624
31,977
kWh
$110
-
kW-mo/yr
-
08 2.7221: Lower temperature during the winter season and vice-versa $654 - $654
12,873
kWh
- -
TOTAL RECOMMENDED $71,917 $119,800 $52,859
1,040,530
kWh
$1,896
-
kW-mo/yr
$17,162
-
MMBtu
TOTAL IMPLEMENTED $8,037 $1,640 $6,251
123,049
kWh
$1,786
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs