Assessment Year | 2016 |
---|---|
Principal Product | Spreadable Cheese |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $10 M to 50M |
# of Employees | 139 |
Plant Area |
144,000
ft2
|
Annual Production | 8,160
ton
|
Production Hrs. Annual | 7,224
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $195,088 | 3,490,913 |
kWh
|
$0.056 | |
Electricity Demand | $69,859 | 8,261 |
kW-mo/yr
|
$8.46 | |
Electricity Fees | $8,604 | - |
|
- | |
Natural Gas | $75,411 | 29,038 |
MMBtu
|
$2.60 | |
Waste Disposal Costs | |||||
Water Usage | $71,903 | 11,020 |
Tgal
|
$6.52 | |
TOTAL YEARLY COSTS | $420,865 | ||||
RECOMMENDED SAVINGS* | $84,156 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $15,954 | $6,213 |
$8,681
155,345
kWh
|
$7,273
-
kW-mo/yr
|
- | |
02 | 2.7134: Use photocell controls | $628 | $290 |
$357
6,372
kWh
|
$271
-
kW-mo/yr
|
- | |
03 | 3.2176: Increase use of automation | $52,696 | $6,000 | - | - | $52,696 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,394 | - |
$2,794
49,998
kWh
|
$600
-
kW-mo/yr
|
- | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $11,093 | - |
$9,123
163,273
kWh
|
$1,970
-
kW-mo/yr
|
- | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $392 | $690 |
$324
5,803
kWh
|
$68
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $84,156 | $13,193 |
$21,279
380,791
kWh
|
$10,182
-
kW-mo/yr
|
$52,696 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs