ITAC Assessment: WM0070
ITAC logo
ITAC Assessment: WM0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread rolls and donuts
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 79,500
ft2
Annual Production 73,660,240
lb
Production Hrs. Annual 6,575
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $402,841 6,394,970
kWh
Electricity Demand $128,611 11,336
kW-mo/yr
Electricity Fees $30,430 -
Natural Gas $420,823 70,421
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,867

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,528 $44,678 $24,811
393,819
kWh
$6,135
-
kW-mo/yr
- $1,582
02 2.7447: Install vinyl strip / high speed / air curtain doors $22,791 $20,960 $(-728.5)
(-11,563)
kWh
- $23,519
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,447 $520 $8,376
132,948
kWh
$2,071
-
kW-mo/yr
- -
04 2.7231: Use radiant heater for spot heating $4,545 $6,320 - - $4,545
-
MMBtu
-
05 2.7135: Install occupancy sensors $2,580 $570 $2,069
32,847
kWh
$510
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,279 $5,355 $2,279
36,167
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,169 $995 $1,738
27,601
kWh
$431
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,038 $1,190 $828
13,211
kWh
$210
-
kW-mo/yr
- -
09 2.2511: Insulate bare equipment $828 $94 - - $828
-
MMBtu
-
TOTAL RECOMMENDED $79,203 $80,682 $39,372
625,030
kWh
$9,357
-
kW-mo/yr
$28,892
-
MMBtu
$1,582
TOTAL IMPLEMENTED $51,867 $53,402 $40,100
636,593
kWh
$9,357
-
kW-mo/yr
$828
-
MMBtu
$1,582
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs