ITAC Assessment: WM0068
ITAC logo
ITAC Assessment: WM0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Household Appliances
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 250,000
ft2
Annual Production 445,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,477 4,113,761
kWh
Electricity Demand $119,991 9,260
kW-mo/yr
Electricity Fees $2,317 -
Natural Gas $248,155 26,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,905

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7134: Use photocell controls $363 $420 $166
2,689
kWh
$197
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $514 $515 $235
3,801
kWh
$279
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,673 $140,000 $17,137
277,026
kWh
$21,536
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,964 $30,000 $4,861
78,577
kWh
$6,103
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,423 $3,575 $1,075
17,377
kWh
$1,348
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,948 $5,400 - - $2,948
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $4,873 $2,860 - - $4,873
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,592 $990 $13,592
219,728
kWh
- -
09 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,440 $3,575 $(-2,042.0)
(-32,996)
kWh
- $8,482
-
MMBtu
10 2.4239: Eliminate or reduce compressed air usage $1,810 $2,627 $676
10,932
kWh
$1,134
-
kW-mo/yr
-
TOTAL RECOMMENDED $82,600 $189,962 $35,700
577,134
kWh
$30,597
-
kW-mo/yr
$16,303
-
MMBtu
TOTAL IMPLEMENTED $24,905 $7,425 $11,550
186,732
kWh
- $13,355
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs