ITAC Assessment: WM0061
ITAC logo
ITAC Assessment: WM0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Metal Febrication
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 300,000
ft2
Annual Production 8,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,707 7,383,040
kWh
Electricity Demand $155,147 18,558
kW-mo/yr
Electricity Fees $21,207 -
Natural Gas $259,658 40,585
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $351,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $6,292 $3,164 - - $6,292
-
MMBtu
- -
02 2.2511: Insulate bare equipment $400 $518 - - $400
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,854 $51,600 $20,279
339,746
kWh
$7,574
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,688 $5,526 $5,598
93,783
kWh
$2,090
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,426 $1,849 $3,848
64,470
kWh
$578
-
kW-mo/yr
- - -
06 2.4314: Use synthetic lubricant $2,017 $1,155 $1,522
25,501
kWh
$495
-
kW-mo/yr
- - -
07 2.2622: Replace existing chiller with high efficiency model $721 $2,000 $578
9,691
kWh
$142
-
kW-mo/yr
- - -
08 2.4239: Eliminate or reduce compressed air usage $5,308 $23,529 $5,308
88,922
kWh
- - - -
09 3.4145: Use magnetic technology to treat water $1,996 $4,600 - - $1,996
-
MMBtu
- -
10 2.8114: Change rate schedules or other changes in utility service $658 $750 - - - $658
-
Tgal
-
11 4.446: Automate finishing process $294,525 $175,000 - - - - $294,525
TOTAL RECOMMENDED $351,883 $269,691 $37,134
622,113
kWh
$10,878
-
kW-mo/yr
$8,688
-
MMBtu
$658
-
Tgal
$294,525
TOTAL IMPLEMENTED $14,130 $8,530 $10,968
183,753
kWh
$3,162
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs