ITAC Assessment: WM0048
ITAC logo
ITAC Assessment: WM0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Metal heat treating and Blasting
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 50,000
ft2
Annual Production 8,500,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,328 1,465,344
kWh
Electricity Demand $67,483 5,194
kW-mo/yr
Electricity Fees $23,981 -
Natural Gas $319,946 55,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $3,124 $239 $2,293
33,470
kWh
$831
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $18,624 $53,646 $13,648
199,236
kWh
$4,976
-
kW-mo/yr
03 2.2135: Repair and eliminate steam leaks $2,471 $270 $1,811
26,431
kWh
$660
-
kW-mo/yr
04 2.7135: Install occupancy sensors $733 $570 $733
10,695
kWh
-
05 2.3212: Optimize plant power factor $5,162 $24,038 - $5,162
-
kW-mo/yr
TOTAL RECOMMENDED $30,114 $78,763 $18,485
269,832
kWh
$11,629
-
kW-mo/yr
TOTAL IMPLEMENTED $29,381 $78,193 $17,752
259,137
kWh
$11,629
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs