ITAC Assessment: WM0041
ITAC logo
ITAC Assessment: WM0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Refurbished Fire Fighting Apparatus
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 43,957
ft2
Annual Production 125
units
Production Hrs. Annual 4,880
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,417 931,680
kWh
Electricity Demand $32,132 2,816
kW-mo/yr
Electricity Fees $9,586 -
Natural Gas $25,989 3,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,140 $2,510 $539
8,796
kWh
- - $601
02 2.7135: Install occupancy sensors $330 $100 $330
5,087
kWh
- - -
03 2.7234: Use heat pump for space conditioning $6,061 $28,350 $(-548.0)
(-8,460)
kWh
- $6,609
-
MMBtu
-
04 2.4314: Use synthetic lubricant $2,025 $868 $1,055
16,287
kWh
$970
-
kW-mo/yr
- -
05 2.4226: Use / purchase optimum sized compressor $2,016 $7,200 $1,407
21,707
kWh
$609
-
kW-mo/yr
- -
TOTAL RECOMMENDED $11,572 $39,028 $2,783
43,417
kWh
$1,579
-
kW-mo/yr
$6,609
-
MMBtu
$601
TOTAL IMPLEMENTED $3,486 $9,810 $2,276
35,590
kWh
$609
-
kW-mo/yr
- $601
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs