ITAC Assessment: WM0033
ITAC logo
ITAC Assessment: WM0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Heavy Metal Fabrication
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 212,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,375 3,912,062
kWh
Electricity Demand $108,941 13,706
kW-mo/yr
Electricity Fees $33,435 -
Natural Gas $164,550 35,087
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $24,320 $57,920 - - $24,320
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,046 - - $2,046
-
kW-mo/yr
- -
03 2.7221: Lower temperature during the winter season and vice-versa $617 - $434
6,921
kWh
$183
-
kW-mo/yr
- -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $4,441 $5,000 - - - $4,441
05 2.7135: Install occupancy sensors $93 $315 $93
1,486
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $3,383 $3,066 $2,465
39,288
kWh
$918
-
kW-mo/yr
- -
07 2.6211: Conserve energy by efficient use of vending machines $204 $273 $204
3,257
kWh
- - -
08 4.611: Begin a practice of predictive / preventative maintenance $5,500 $1,860 - - - $5,500
TOTAL RECOMMENDED $40,604 $68,434 $3,196
50,952
kWh
$3,147
-
kW-mo/yr
$24,320
-
MMBtu
$9,941
TOTAL IMPLEMENTED $4,534 $5,315 $93
1,486
kWh
- - $4,441
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs