ITAC Assessment: WM0024
ITAC logo
ITAC Assessment: WM0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Engraved Rotogravure cylinders
NAICS 323120: Support Activities for Printing
SIC 2796: Platemaking and Related Services
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 43,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,469 1,533,200
kWh
Electricity Demand $42,009 3,700
kW-mo/yr
Electricity Fees $22,811 -
Natural Gas $16,904 2,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,003 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $519 $974 $385
5,928
kWh
$135
-
kW-mo/yr
02 2.7135: Install occupancy sensors $950 $550 $950
14,640
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,156 - $5,416
83,474
kWh
$740
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $287 - $212
3,273
kWh
$75
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $264 $276 $196
3,021
kWh
$68
-
kW-mo/yr
06 4.652: Replace existing equipment with more suitable substitutes $827 $2,009 $827
9,416
kWh
-
TOTAL RECOMMENDED $9,003 $3,809 $7,986
119,752
kWh
$1,018
-
kW-mo/yr
TOTAL IMPLEMENTED $8,220 $2,559 $7,405
110,803
kWh
$815
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs