ITAC Assessment: GT0236
ITAC logo
ITAC Assessment: GT0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CORRUGATED PAPER BOARD
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 250,000
thousand feet
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,632 2,456,038
kWh
Natural Gas $91,202 16,725
MMBtu
LPG $10,046 1,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,659 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,529

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $49 - $49
879
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,120 $50 $1,120
20,223
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,182 - $1,182
21,395
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,004 - $1,004
18,171
kWh
-
05 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,625 $5,000 - $2,625
-
MMBtu
06 2.4133: Use most efficient type of electric motors $356 $546 $356
6,448
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $1,323 $2,000 - $1,323
-
MMBtu
TOTAL RECOMMENDED $7,659 $7,596 $3,711
67,116
kWh
$3,948
-
MMBtu
TOTAL IMPLEMENTED $2,529 $596 $2,529
45,721
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs