ITAC Assessment: WM0020
ITAC logo
ITAC Assessment: WM0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Braking and clutch components for non-automotive manufacturers
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 7,530
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,627 4,954,060
kWh
Electricity Demand $122,056 10,750
kW-mo/yr
Electricity Fees $53,283 -
Natural Gas $16,261 1,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,644 $813 $5,191
80,199
kWh
$1,453
-
kW-mo/yr
- - - - - - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $804 $1,510 $(-8.0)
(-116)
kWh
- - $812
-
MMBtu
- - - - -
03 2.7221: Lower temperature during the winter season and vice-versa $5,990 - $4,277
66,087
kWh
$636
-
kW-mo/yr
- $1,077
-
MMBtu
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,607 $4,693 $2,085
32,228
kWh
$522
-
kW-mo/yr
- - - - - - -
05 3.5313: Increase amount of waste recovered for resale $4,570 - - - $(-118.4) - $6,832
-
lb
$(-2,092.0) - $(-52.0) -
06 3.5316: Contract a wood pallet recycling company $2,955 - - - - - - $(-2,092.0) $(-1,200.0) - $6,247
TOTAL RECOMMENDED $23,569 $7,016 $11,545
178,398
kWh
$2,611
-
kW-mo/yr
$(-118.4) $1,889
-
MMBtu
$6,832
-
lb
$(-4,184.0) $(-1,200.0) $(-52.0) $6,247
TOTAL IMPLEMENTED $22,765 $5,506 $11,553
178,514
kWh
$2,611
-
kW-mo/yr
$(-118.4) $1,077
-
MMBtu
$6,832
-
lb
$(-4,184.0) $(-1,200.0) $(-52.0) $6,247
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs