Assessment Year | 2012 |
---|---|
Principal Product | printed circuit boards |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
147,000
ft2
|
Annual Production | 775,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $238,258 | 3,663,000 |
kWh
|
$0.065 |
Electricity Demand | $93,442 | 8,490 |
kW-mo/yr
|
$11.01 |
Electricity Fees | $77,292 | - |
|
- |
Natural Gas | $25,923 | 5,169 |
MMBtu
|
$5.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,857 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,061 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,304 | $1,675 | - |
$1,304
-
MMBtu
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $1,345 | $375 | - | - |
$1,345
-
Tgal
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $771 | $100 |
$771
11,856
kWh
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,999 | $5,230 |
$190
2,929
kWh
|
$1,809
-
MMBtu
|
- | |
05 | 2.7224: Reduce space conditioning during non-working hours | $2,779 | $4,500 |
$1,900
29,225
kWh
|
$879
-
MMBtu
|
- | |
06 | 2.7229: Air condition only space necessary | $597 | $975 |
$597
9,191
kWh
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $62 | $128 |
$19
289
kWh
|
$43
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $8,857 | $12,983 |
$3,477
53,490
kWh
|
$4,035
-
MMBtu
|
$1,345
-
Tgal
|
||
TOTAL IMPLEMENTED | $2,061 | $5,358 |
$209
3,218
kWh
|
$1,852
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs