ITAC Assessment: MZ0154
ITAC logo
ITAC Assessment: MZ0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Plumbing and roofing products
NAICS 332913: Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 100,000
ft2
Annual Production 55,351,120
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,511 2,932,800
kWh
Natural Gas $17,500 2,581
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $9,053 $1,680 $9,053
99,254
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,547 $10,920 $8,547
93,705
kWh
-
03 2.7134: Use photocell controls $4,064 $6,700 $4,064
44,554
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,059 $1,260 $3,699
40,551
kWh
$(-640.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,821 $1,740 $1,821
19,968
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $383 $850 $383
4,200
kWh
-
TOTAL RECOMMENDED $26,927 $23,150 $27,567
302,232
kWh
$(-640.0)
TOTAL IMPLEMENTED $3,442 $2,110 $4,082
44,751
kWh
$(-640.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs