ITAC Assessment: WM0008
ITAC logo
ITAC Assessment: WM0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Technical Test
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 490
Plant Area 458,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,102,815 18,458,584
kWh
Electricity Demand $542,599 49,862
kW-mo/yr
Electricity Fees $151,570 -
Natural Gas $397,941 87,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $16,760 - $16,760
336,960
kWh
- -
02 2.6218: Turn off equipment when not in use $8,834 - $8,834
147,744
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,802 - $1,464
20,956
kWh
$1,338
-
kW-mo/yr
-
04 2.4234: Cool compressor air intake with heat exchanger $40,676 $83,400 - - $40,676
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $3,551 $1,000 $1,853
26,532
kWh
$1,698
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $2,737 - $2,737
49,191
kWh
- -
07 2.6218: Turn off equipment when not in use $432 $520 $432
6,641
kWh
- -
08 2.7135: Install occupancy sensors $1,209 $990 $1,209
18,275
kWh
- -
09 2.7492: Use proper thickness of insulation on building envelope $9,137 $3,034 $9,137
130,810
kWh
- -
10 2.7492: Use proper thickness of insulation on building envelope $840 $400 $840
12,025
kWh
- -
TOTAL RECOMMENDED $86,978 $89,344 $43,266
749,134
kWh
$3,036
-
kW-mo/yr
$40,676
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs