ITAC Assessment: WI0519
ITAC logo
ITAC Assessment: WI0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product aluminum castings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $50
M
to 100
M
# of Employees 550
Plant Area 250,000
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $926,815 20,253,774
kWh
Electricity Demand $467,496 103,063
kW-mo/yr
Natural Gas $135,714 21,464
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $39,942 $17,500 - - $39,942
-
MMBtu
-
02 4.424: Improve space comfort conditioning $30,000 $1,800 - - - $30,000
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,569 $14,240 $6,319
130,830
kWh
$1,250
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,299 - $3,513
72,735
kWh
$786
-
kW-mo/yr
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,255 $4,000 $2,330
48,233
kWh
$1,925
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $3,324 $1,920 $2,267
46,933
kWh
$1,057
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $1,250 $300 $1,250
25,859
kWh
- - -
TOTAL RECOMMENDED $90,639 $39,760 $15,679
324,590
kWh
$5,018
-
kW-mo/yr
$39,942
-
MMBtu
$30,000
TOTAL IMPLEMENTED $37,623 $3,720 $5,780
119,668
kWh
$1,843
-
kW-mo/yr
- $30,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs