Assessment Year | 2005 |
---|---|
Principal Product | Spices & seasonings |
NAICS | 311942: Spice and Extract Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 78 |
Plant Area |
48,000
ft2
|
Annual Production | 37,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,343 | 1,495,440 |
kWh
|
$0.034 |
Electricity Demand | $37,433 | 3,434 |
kW-mo/yr
|
$10.90 |
Natural Gas | $27,256 | 3,020 |
MMBtu
|
$9.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,701 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,973 | $16,740 |
$4,839
136,710
kWh
|
$3,134
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $1,049 | - |
$419
11,839
kWh
|
$269
-
kW-mo/yr
|
$361
-
MMBtu
|
|
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,464 | - | - |
$3,464
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,464 | $1,000 | - | - |
$2,464
-
MMBtu
|
|
05 | 2.3132: Recharge batteries on during off-peak demand periods | $1,795 | $800 | - |
$1,795
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,430 | - |
$832
23,499
kWh
|
$598
-
kW-mo/yr
|
- | |
07 | 2.6121: Reduce hot water temperature to the minimum required | $990 | $1,500 | - | - |
$990
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,165 | $20,040 |
$6,090
172,048
kWh
|
$9,260
-
kW-mo/yr
|
$3,815
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,701 | $20,040 |
$6,090
172,048
kWh
|
$5,796
-
kW-mo/yr
|
$3,815
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |