| Assessment Year | 2005 |
|---|---|
| Principal Product | Aluminum Castings |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
| Sales Range | $50 M to 100M |
| # of Employees | 450 |
| Plant Area |
270,000
ft2
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $571,983 | 17,833,400 |
kWh
|
$0.032 |
| Electricity Demand | $335,292 | 28,813 |
kW-mo/yr
|
$11.64 |
| Electricity Fees | $57,504 | - |
|
- |
| Natural Gas | $871,303 | 124,045 |
MMBtu
|
$7.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $110,704 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,163 | $49,680 |
$19,199
568,008
kWh
|
$9,964
-
kW-mo/yr
|
- | - | |
| 02 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $26,534 | $11,200 | - | - |
$26,534
-
MMBtu
|
- | |
| 03 | 3.5316: Contract a wood pallet recycling company | $22,020 | - | - | - | - | $22,020 | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $12,731 | $1,920 |
$8,074
238,889
kWh
|
$4,657
-
kW-mo/yr
|
- | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $13,287 | $1,300 |
$13,287
393,107
kWh
|
- | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,969 | $2,000 |
$3,152
93,250
kWh
|
$3,817
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $110,704 | $66,100 |
$43,712
1,293,254
kWh
|
$18,438
-
kW-mo/yr
|
$26,534
-
MMBtu
|
$22,020 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs