ITAC Assessment: WI0488
ITAC logo
ITAC Assessment: WI0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Powder painting
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 170,000
ft2
Annual Production 6,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,384 4,109,952
kWh
Electricity Demand $112,843 11,427
kW-mo/yr
Electricity Fees $13,449 -
Natural Gas $490,116 68,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,607

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 3.2176: Increase use of automation $64,000 $500,000 - - - - $64,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $23,442 $86,314 $10,594
410,620
kWh
$12,848
-
kW-mo/yr
- - -
03 3.3128: Utilize other methods to remove contaminants $64,000 $17,000 - - - $64,000
-
Tgal
-
04 2.7261: Install timers and/or thermostats $1,604 $600 - - $1,604
-
MMBtu
- -
05 2.7135: Install occupancy sensors $347 $100 $347
13,456
kWh
- - - -
06 2.4239: Eliminate or reduce compressed air usage $307 $156 $5
201
kWh
$302
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $131 $800 $131
5,090
kWh
- - - -
08 2.4312: Improve lubrication practices $214 $273 $110
4,284
kWh
$104
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $154,045 $605,243 $11,187
433,651
kWh
$13,254
-
kW-mo/yr
$1,604
-
MMBtu
$64,000
-
Tgal
$64,000
TOTAL IMPLEMENTED $89,607 $587,287 $11,051
428,360
kWh
$12,952
-
kW-mo/yr
$1,604
-
MMBtu
- $64,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs