ITAC Assessment: WI0475
ITAC logo
ITAC Assessment: WI0475
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $50
M
to 100
M
# of Employees 340
Plant Area 180,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,114 7,435,103
kWh
Electricity Demand $155,317 20,209
kW-mo/yr
Electricity Fees $72,739 -
Natural Gas $1,088,905 193,754
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $153,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $97,164 $40,200 - - $97,164
-
MMBtu
02 2.2514: Cover open tanks $18,376 $1,000 - - $18,376
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,417 $33,120 $10,311
314,370
kWh
$5,106
-
kW-mo/yr
-
04 2.3134: Shift from daytime to nighttime operation $6,708 - - $6,708
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $4,236 - $2,055
62,664
kWh
$2,181
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,127 $1,976 $2,092
63,783
kWh
$1,035
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $2,987 $1,920 $1,852
56,480
kWh
$1,135
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,924 $80 $1,712
52,220
kWh
$1,212
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,527 $5,140 $2,527
77,032
kWh
- -
TOTAL RECOMMENDED $153,466 $83,436 $20,549
626,549
kWh
$17,377
-
kW-mo/yr
$115,540
-
MMBtu
TOTAL IMPLEMENTED $42,831 $38,096 $15,967
486,853
kWh
$8,488
-
kW-mo/yr
$18,376
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs