ITAC Assessment: GT0705
ITAC logo
ITAC Assessment: GT0705
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Towels
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 105,000
ft2
Annual Production 7,055,116
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,157 5,405,231
kWh
Electricity Demand $132,757 11,673
kW-mo/yr
Electricity Fees $31,731 -
Natural Gas $272,877 74,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.1113: Reduce combustion air flow to optimum $37,979 $10,000 - - - $37,979
-
MMBtu
- - - - -
02 3.4116: Meter recycled water (to reduce sewer charges) $6,635 $8,000 - - - - - - - $6,635 -
03 3.4151: Minimize water usage $1,457 $300 - - - - $619
-
Tgal
- - - $838
-
Tgal
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,420 - $1,471
49,041
kWh
$791
-
kW-mo/yr
$158 - - - - - -
05 3.5217: Reuse / recycle/ sell paper products $3,265 - - - - - - $3,265
-
lb
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,784 $16,840 $4,042
134,720
kWh
$2,193
-
kW-mo/yr
$549 - - - - - -
07 2.4133: Use most efficient type of electric motors $5,152 $44,647 $2,774
92,463
kWh
$1,914
-
kW-mo/yr
$464 - - - - - -
08 4.111: Add equipment/ operators to reduce production bottleneck $120,000 $700,000 - - - - - - $120,000 - -
TOTAL RECOMMENDED $183,692 $779,787 $8,287
276,224
kWh
$4,898
-
kW-mo/yr
$1,171 $37,979
-
MMBtu
$619
-
Tgal
$3,265
-
lb
$120,000 $6,635 $838
-
Tgal
TOTAL IMPLEMENTED $3,877 $300 $1,471
49,041
kWh
$791
-
kW-mo/yr
$158 - $619
-
Tgal
- - - $838
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs