Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Thermoplastic Polyurethane Film and Sheet
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 107,000
ft2
Annual Production 7,200,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,930 6,151,680
kWh
Electricity Demand $210,526 13,478
kW-mo/yr
Electricity Fees $55,297 -
Natural Gas $76,893 7,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,554 $9,225 $6,699
158,627
kWh
$4,855
-
kW-mo/yr
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,604 $13,500 $5,659
133,995
kWh
$4,123
-
kW-mo/yr
$(-4,178.0)
-
MMBtu
03 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $3,778 - $2,341
19,696
kWh
- $1,437
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,391 $1,102 $1,966
46,512
kWh
$1,425
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,289 $1,100 $747
17,687
kWh
$542
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $982 $3,275 $982
23,256
kWh
- -
TOTAL RECOMMENDED $26,598 $28,202 $18,394
399,773
kWh
$10,945
-
kW-mo/yr
$(-2,741.0)
-
MMBtu
TOTAL IMPLEMENTED $17,216 $14,702 $10,394
246,082
kWh
$6,822
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings