ITAC Assessment: WI0469
ITAC logo
ITAC Assessment: WI0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 40,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,397 3,423,000
kWh
Electricity Demand $80,146 7,746
kW-mo/yr
Electricity Fees $32,200 -
Natural Gas $60,827 8,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,616 $14,400 $3,737
110,250
kWh
$2,879
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,071 - $531
15,666
kWh
$540
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $626 - $354
10,444
kWh
$272
-
kW-mo/yr
04 2.2511: Insulate bare equipment $588 $249 $272
8,019
kWh
$316
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $463 $640 $239
7,053
kWh
$224
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $258 $107 $165
4,860
kWh
$93
-
kW-mo/yr
TOTAL RECOMMENDED $9,622 $15,396 $5,298
156,292
kWh
$4,324
-
kW-mo/yr
TOTAL IMPLEMENTED $2,543 $356 $1,322
38,989
kWh
$1,221
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs