Assessment Year | 2004 |
---|---|
Principal Product | Aluminum Castings |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3365: Aluminum Foundries |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
40,000
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $110,397 | 3,423,000 |
kWh
|
$0.032 |
Electricity Demand | $80,146 | 7,746 |
kW-mo/yr
|
$10.35 |
Electricity Fees | $32,200 | - |
|
- |
Natural Gas | $60,827 | 8,510 |
MMBtu
|
$7.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,622 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,543 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,616 | $14,400 |
$3,737
110,250
kWh
|
$2,879
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,071 | - |
$531
15,666
kWh
|
$540
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $626 | - |
$354
10,444
kWh
|
$272
-
kW-mo/yr
|
|
04 | 2.2511: Insulate bare equipment | $588 | $249 |
$272
8,019
kWh
|
$316
-
kW-mo/yr
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $463 | $640 |
$239
7,053
kWh
|
$224
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $258 | $107 |
$165
4,860
kWh
|
$93
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $9,622 | $15,396 |
$5,298
156,292
kWh
|
$4,324
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $2,543 | $356 |
$1,322
38,989
kWh
|
$1,221
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs