ITAC Assessment: WI0463
ITAC logo
ITAC Assessment: WI0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Blinds
NAICS 337920: Blind and Shade Manufacturing
SIC 2591: Drapery Hardware and Window Blinds and Shades
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 250,000
ft2
Annual Production 420,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $554,870 15,684,787
kWh
Electricity Demand $286,959 30,181
kW-mo/yr
Electricity Fees $53,929 -
Natural Gas $304,940 41,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 3.4114: Replace city water with recycled water via cooling tower $75,927 $18,500 $(-4,854.0)
(-930,996)
kWh
- - $80,781
-
Tgal
02 2.1221: Replace obsolete burners with more efficient ones $17,690 $17,690 - - $17,690
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $15,360 $2,000 - - $15,360
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,859 $29,148 $10,002
268,162
kWh
$3,857
-
kW-mo/yr
- -
05 2.4224: Upgrade controls on compressors $11,920 $12,595 $11,920
319,586
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $7,605 $840 $5,231
140,245
kWh
$2,374
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,530 $15,200 $6,530
175,104
kWh
- - -
TOTAL RECOMMENDED $148,891 $95,973 $28,829
(-27,899)
kWh
$6,231
-
kW-mo/yr
$33,050
-
MMBtu
$80,781
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs