ITAC Assessment: ME0227
ITAC logo
ITAC Assessment: ME0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product yachts
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 66,000
ft2
Annual Production 60
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,331 582,356
kWh
Electricity Demand $16,156 1,889
kW-mo/yr
Electricity Fees $1,436 -
Fuel Oil #2 $16,781 2,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,968

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings Primary Raw Material Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,383 $7,504 $2,921
41,032
kWh
$3,540
-
kW-mo/yr
$(-1,078.0)
-
MMBtu
- -
02 2.2515: Use optimum thickness insulation $790 $960 - - $790
-
MMBtu
- -
03 2.8121: Apply for tax-free status for energy purchases $756 - - - - $756 -
04 2.2515: Use optimum thickness insulation $515 $588 $515
4,689
kWh
- - - -
05 4.821: Pay bills on time to avoid late fees $512 - - - - $512 -
06 2.2515: Use optimum thickness insulation $408 $75 $408
5,862
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $359 $100 $359
5,275
kWh
- - - -
08 2.4221: Install compressor air intakes in coolest locations $217 $185 $217
3,224
kWh
- - - -
09 3.5313: Increase amount of waste recovered for resale $1,200 - - - - - $1,200
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $540 $1,188 - - - - $540
TOTAL RECOMMENDED $10,680 $10,600 $4,420
60,082
kWh
$3,540
-
kW-mo/yr
$(-288.0)
-
MMBtu
$1,268 $1,740
TOTAL IMPLEMENTED $8,968 $10,600 $4,420
60,082
kWh
$3,540
-
kW-mo/yr
$(-288.0)
-
MMBtu
$756 $540
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs